Senior Project - Maker's Cart

By KTED010
  • Period: to

    Proposal

    Worked on my proposal for my senior project: 10 hours worth
  • Period: to

    Cart Design Research

    Reaserched designs for the cart: 5 hours
  • Period: to

    Material Research

    Reaserched materials needed to build and stock the cart: 5 hours
  • Worked with mentor

    Met with and worked with mentor: 1 hour
  • Finished my proposal

    Finished my proposqal finally: 1.5 hours
  • Finished my letter of intent

    Finally managed to finish my Letter of intent: 1.5 hours
  • Research Design for cart

    Video Reaserached cart designs and costs, settled on this design: 1 hour
  • Article

    Worked on my senior project article for a bit: 2 hours
  • Researched Tools

    I reasearched the tools I would need to put on my cart and their expected cost: 2 hours
  • Asked Locals for stuff

    Asked North Bay Plywood for Doors: 1.5 hours
  • Article

    Worked on the Article more: 3 hours
  • Researched tools

    I reasearched the tools I would need to put on my cart and their expected cost: Half an hour
  • Donation Requests

    I went to Ace, Central Valley, and Orchard asking for donations: 1.5 hours
  • Tool Donations

    Went to Orchard and picked up tools: 1.5 hours
  • Worked with Mentor

    I went with mentor to pick up doors from North Bay Plywood: Half an hour
  • Final Cart design

    Video link I created my own plans based on the video: 1.5 hours
  • Cart Build

    First day of building cart, more than half way done: 3 hours
  • Article

    Worked hard on senior project Article: 5 hours
  • Period: to

    Tool Donations

    Went to home depot and worked with the employees to get tools: 1 hour
  • Article

    Finished up my senior project artcle, almost: 1.5 hours
  • Timeline

    Made this damn Line of Time: 1 hour
  • Finished Senior Project Article

    Finally finished that assiment, the day before it was due. Total time: 3.5 hours
  • Talked at Napa Auto Parts about donations

    Asked Napa auto parts for donations for my cart total time: 15 minutes
  • Worked on Cart

    Worked a lot more on the cart, nearly finished. Total time: 3 hours
  • Period: to

    Conversed with Central Valley

    Talked to Central Valley in person and via email/phone, worked on a wishlist, waited for them, and finally picked up the supplies from them. Total time: 2 hours
  • Picked up Napa Auto Parts Donation

    Picked up set of wrenches from Napa Auto Parts. Total time: 15 minutes
  • Cart Work

    Cart Work
    Worked on the cart, nearly finished Total time: 1 hour
  • Returned wood and planned

    Returned worthless wood, and talked about my cart's future with my mentro. Total time: 1 hour
  • Bell Product's Request

    Asked Bell Product's for a donation of sheet metal for Cart top. Total time: 15 minutes
  • Talked to Napa Valley Engraving

    Asked Napa Valley Engraving for donation of a plaque honoring everyone who's donated. Total time: 15 minutes
  • Paperwork Stuff

    Worked on making Costs spreadsheet look nice and updated timeline. Total time: 2 hours
  • Sheet Metal

    Went to Bell Products to finilaize the details for getting the donation. Total time: 1 hour
  • Buying supplies

    WEnt and purchased corded drill and drill bits from Home Depot. Total time: 1 hour
  • Visited Engraving Location

    Visited Engraving Location
    We visited the engraving shop and talked about getting a plaque to honor those who helped with the cart, including dimensions and wording. Time spent: half an hour
  • Deliverd Cart

    My mother and I picked up the cart from my mentor's house and brought it to school. Time Spent: 1 hour
  • Delivered cart supplies

    Brought the rest of the cart supplies and tools, stocked the cart. Time spent: half an hour